The Salesian of
Don Bosco Boy
Training Institute
Commercial
Project Type
Karen, Nairobi
Location
5 October 2024
Completion Date
Project Type; Building
Builders Works;
• Setting Out.
• Excavations.
• Substructure; Column Bases,
Stub Columns, Filling & Floor
Slab.
• RC Frame (concrete columns
and beams)
• Masonry Walling.
• IT5 Roofing (Steel trusses &
Purlins, & IT5 Sheets)
• Plastering and Floor Screed.
• Excavation for Washroom
Waste Drainage System.
Fine Finishes.
• Gypsum, Frameless glass, Glass
Curtain Walls and Aluminum
Frameless Glass Walling.
• Aluminium/Laminated Board
Partitioning.
• Security & Fire Rated Doors.
• Frameless Glass Door,
Customized Steel Doors and
Laminated Washroom Doors.
• Projecting Aluminium Windows
• Tiling, & Granite Finishes.
• Acoustic and Gypsum Ceiling
Services;
Electrical and Fire detection
system
• Structured Cabling and Security
System.
• Plumbing, Drainage, Water
Reticulation & Sanitary system,
WC, Granite Top WHB.
• Waterproofing Gutters and Flat
roof.
Cabinetry and Fixtures;
(Workshop Cubicles in Block
Board)

GET STARTED